The fifth step of the Volga cascade (1,370 MW), under construction since 1968 and never finished: the station runs at the lowered 63-metre level while the regions keep arguing.
Cheboksary Hydroelectric Plant
The Cheboksary hydro plant stands on the Volga by Novocheboksarsk: the fifth step of the Volga cascade, the last built, with an installed capacity of 1,370 MW — among Russia's largest. The station's reservoir spans three regions — Chuvashia, Mari El and Nizhny Novgorod oblast. The structures belong to RusHydro, except the navigation lock, which is federally owned. The plant's chief peculiarity is its incompleteness: the construction of the hydro unit, begun in 1968, has never been finished because of conflicts between the regions over the reservoir's water level. Since 1981 the plant has run at the lowered 63-metre level, with the reservoir zone left unfitted — a source of economic and ecological problems; the question of completion draws criticism from civic organisations and disputes between the governors of three regions. The project line is long: the idea of a hydro unit near Cheboksary figured in the very first studies of the Great Volga Bureau of the early 1930s, led by Professor Chaplygin — the cascade was to join the Caspian, Black, Baltic and White seas. The dam's foundation soils are clays, argillites and limestones; the right-bank slope of the valley is high and steep, the left one made of a floodplain and three sandy terraces — a sharp asymmetry of the Volga here. The visit runs from the lower reach by Novocheboksarsk: the plant building, the dam and the lock are seen whole, and the reservoir opens from the Cheboksary side. Pair it with the Volga line Mariinsky Posad — Kozlovka. The best light is evening, when the dam is lit. For the engineering tourist this is a rare case: an unfinished plant working at full force.
How to get there
From Cheboksary across the bridge towards Novocheboksarsk; the plant's lower reach lies by the town, with lookouts on the right bank.
Best season
May to September: the dam's evening lighting and the smooth reservoir.
Travel tips & stories
The fifth cascade step at 1,370 MW — yet its completion has been impossible since 1968.
The 63-metre level instead of the designed one — a source of economic and ecological disputes.
A lookout at the lower reach: the dam and the lock in one frame.
To sync favorites and plans across devices,
Local guides
- TR
TrueRussia administrator
Added by administrator
On map
In catalog since November 20, 2026
Nearby places
Common questions
- How do I get to Cheboksary Hydroelectric Plant?
- From Cheboksary across the bridge towards Novocheboksarsk; the plant's lower reach lies by the town, with lookouts on the right bank.
- When is the best time to visit Cheboksary Hydroelectric Plant?
- May to September: the dam's evening lighting and the smooth reservoir.