The most powerful hydro plant of the North Caucasus (1,050 MW) with Russia's highest arch dam: 232.5 metres of concrete in the narrow Sulak gorge over two hundred metres deep.

Region: Republic of DagestanCoordinates: 42°59′N 46°52′E

Chirkey Hydroelectric Plant

The Chirkey hydro plant stands on the Sulak by the settlement of Dubki in the Buynaksk district: the most powerful power station of the North Caucasus, with an installed capacity of 1,050 MW and an average yearly output of about 2,420 million kilowatt-hours. It is the upper, regulating step of the Sulak cascade and belongs to RusHydro's Dagestan branch. The machine hall lies by the dam: water falls straight to the units. The plant's chief value is its concrete arch dam: 338 metres along the crest, a maximum height of 232.5 metres. It is the second-highest dam in Russia after the Sayano-Shushenskaya (whose structure is arch-gravity, not a pure arch) and the highest arch dam in the country; its body is divided into eighteen concreting sections sixteen metres wide. The dam is squeezed into a gorge over two hundred metres deep, its width narrowing from three hundred metres at the top to twelve or fifteen below. The engineering drama of the construction lies in the geology: the gorge is formed of strong Upper Cretaceous limestones with interlayered marls and clays, heavily fissured to depths of 150 metres; the walls hold potentially unstable rock blocks of about three hundred thousand cubic metres. The district's seismicity is nine on the MSK-64 scale. The river carries up to 21.4 million tonnes of sediment a year, and the flood runs from late March to late August. The visit runs from the side of Dubki: the plateau over the gorge, views of the dam's arch and the mirror of the Chirkey reservoir stretching up the valley. With the Sulak canyon downstream it forms a one-day pair: the dam as the engineering landmark, the canyon as the natural one. The best time is late summer, when the reservoir is drawn down and the banks read as terraces.

How to get there

From Makhachkala by the road to Dubki in the Buynaksk district; the dam lies by the settlement, with lookout views from the plateau over the gorge.

Best season

All year — plateau views; the best bank contrast is late summer.

Travel tips & stories

  • 232.5 metres — the second-highest dam in Russia: the arch's scale reads only from the plateau, not from below.

  • Nine-point seismicity and unstable blocks — the plant was built with all of this in mind.

  • Pair it with the Sulak canyon: the dam and the canyon make a one-day pair.

hydro plantdamSulak cascadeDubkiengineering landmark

To sync favorites and plans across devices,

Local guides

  • TR

    TrueRussia administrator

    Added by administrator

On map

In catalog since November 17, 2026

Common questions

How do I get to Chirkey Hydroelectric Plant?
From Makhachkala by the road to Dubki in the Buynaksk district; the dam lies by the settlement, with lookout views from the plateau over the gorge.
When is the best time to visit Chirkey Hydroelectric Plant?
All year — plateau views; the best bank contrast is late summer.